At 6.49 P.M. on September 7, 2016, there was received information about that two people were ruined by sand. There was dug a pit with the depth of 3 to 5 meters and with the size of 3 by 10 meters, and concrete slabs were lying next to the pit. Further, the ground and sand slipped down with sliding of a slab on the workers, who worked on the bottom of the pit. At 8.20 P.M. one of the workers body was taken out from the depth of 2.5 meters. At 10.11 P.M. another worker’s body was taken out from the depth of five meters. Ambulance station employees verified their death.