A complex of preventive measures on reduction of risks of flooding is implemented on the territory of the region taking into account the weather conditions forecast. The situation is complicated by two ice jams, the length of which is measured in tens of kilometers. Two ice-breakers operate for their destruction, and demolition teams where the depth does not allow. Since the beginning of the flood protection works in Vologda Oblast there have been committed 32 underminings of the ice on eight sites; throughout the day, another 8 tons of explosives will come to the region. Total of 396 people and 122 units of equipment, 38 boats were attracted to the elimination of the flood consequences.