During the monitoring of the flood situation, there was identified partial erosion of the ground by water near the water pipe of the dam, on which the road passes. There is a risk of partial destruction of the road section. To prevent the destruction of the dam and the violation of the integrity of the road, the traffic of lorries was blocked. A post of traffic police was deployed. In case of the worst development of the situation there is a possibility of flooding of yards in the settlement of Kugarchino.